OMV Talesbrunn Update

Just before the summer break we have managed to install the third unit control panel upgrade for gas compression unit 2 at OMV Tallesbrunn in Austria.
Written by Marco de Vries on 23.07.2019, 10:26

In a few weeks time we will start with the commissioning of the third Solar Saturn 20 gas turbine. The second unit has been completed recently by our commissioning team.

The complete upgrade on the controls side as well as the fuel gas system was designed by Holland-Controls.

What's new on Tallesbrunn:

  •   Controls system upgrade to Allen Bradley Guardlogix with point I/O and integrated Anti-Surge control
  •   Vibration monitoring with Bently Nevada 3701
  •   Over speed protection with Braun Tacho
  •   Co-ax shut-off and vent valves
  •   Fuel gas metering by Meggit XVG
  •   Wonderware based Human Machine Interface
  •   Replaced pressure switches with modern pressure transmitters

This website uses cookies to track your behavior and ensure you to get the best experience on our website. These cookies are essential for the correct display and functioning of the website, below you can accept the cookies.

You can always delete saved cookies in the advanced settings of your browser

Accept cookies